Consultation Phases
Example: High-Technology Park, Wendelsheim

 
 
Example 1   Solar radiation analysis,
shading analysis,
determination of lighting conditions
in the building
 
 
Example 2   Calculation of the effect of
the planned sun-shading devices
on the lighting and thermal conditions
in the building
 
 
Example 3   Optimisation of the sun-shading device
with respect to:
+ protection against glare
+ solar heating gains during the heating season,
+ transmission of light without heat during summer
+ maximum field of view
 
 
Example 4   Result:
Reduction of
+ the artificial lighting demand by 35-55%
+ the heating load by 15%-25%
+ the cooling load by 15%
Amortisation period: about 6.2 years